
United States:
2457 Kane Lane, Batavia, Illinois
60510
Finance, inventory, manufacturing, procurement, and people on one system — with real-time reporting your leadership team can act on the same day.
Built to work seamlessly with the platforms that power your business.
WP
WPConnectors, industry modules, and automation add-ons covering sales, inventory, accounting, manufacturing, and AI. Install what you need into your existing database and leave the rest of your Odoo setup untouched.
Start development with our team to turn your idea into a scalable, high-quality software solution with efficient execution and expert support.
Get a recommended roadmapSee how SDLC Corp solves business challenges with tailored solutions and results that move key metrics.
Book Consultation NowConnect Shopify with Odoo to automate products, orders, and inventory—ensuring accurate data flow and reduced manual work.

Connect Magento with Odoo to automate products, orders, customers, stock, and invoices reducing manual updates and improving store operations.

Connect PrestaShop with Odoo to sync products, orders, customers, and inventory in real time so your store and backend stay aligned without manual work.

Every SDLC Corp product is engineered with the same core principles security, scalability, and developer-first design across every domain.
Architecture
Products use microservices architecture that scales from startup to enterprise workloads.
Security
SOC 2 compliant with encryption, role-based access, and threat monitoring.
Integration
Connect to 200+ tools via our REST & GraphQL API with pre-built connectors.
Docs
Developer docs, API references, and integration guides for each product.
Updates
Feature releases and security patches deployed without downtime.
Support
24/7 support with dedicated managers, SLA guarantees, and priority resolution.
Performance
Optimized services, caching, and delivery patterns keep products fast under real-world load.
Observability
Operational monitoring, logs, and product analytics provide continuous visibility into system health.
Compliance
Governance, access controls, auditability, and deployment standards support enterprise environments.
FAQ
Find practical answers about our Unreal Engine services, project scope, development costs, timelines, platform capabilities, ownership, and post-launch support.
Services and Scope
An Unreal Engine game development company provides full-cycle game production, co-development, gameplay and C++ programming, multiplayer and backend development, 3D art and environment production, platform porting, performance optimization, QA and compliance testing, and post-launch LiveOps support across PC, console, mobile and XR.
Yes. Unreal Engine 5 is our default for new projects, including Nanite virtualized geometry, Lumen global illumination, World Partition streaming, Niagara VFX, Chaos physics and MetaHuman characters. We also maintain and upgrade existing UE4 projects, including full UE4-to-UE5 migrations.
Yes. We handle engine migrations to Unreal, including UE4-to-UE5 upgrades and ports from other engines. Migration work usually begins with a technical audit that assesses which assets and systems can be carried across versus rebuilt, followed by a phased plan with a cost estimate for each stage.
Cost and Timeline
Unreal Engine game development typically costs $30,000–$80,000 for a prototype, $80,000–$250,000 for a small commercial title, and $250,000–$1,000,000 or more for a mid-scale multi-platform game. Scope, platform count, multiplayer requirements and art volume drive the difference far more than hourly rates.
A prototype takes four to eight weeks, a vertical slice three to four months, a small commercial title six to twelve months, and a mid-scale multi-platform title twelve to twenty-four months. Console certification adds a further two to six weeks and should be scheduled explicitly.
Technical Capability
Yes. We build replicated gameplay, dedicated server architecture, matchmaking, lobbies, sessions and live economies using Epic Online Services, Photon, PlayFab and custom backends, plus the bandwidth profiling, latency simulation and concurrency load testing needed to verify it holds at launch scale.
Yes. Optimization is one of our most common engagements. We profile on your target hardware using Unreal Insights and platform-native tools, identify the actual bottleneck, and deliver a prioritized fix list with measured before-and-after frame times. These engagements typically run three to ten weeks.
Yes. We develop and port Unreal Engine titles for PlayStation 5, Xbox Series X and Series S, and Nintendo Switch and Switch 2, including platform feature integration, per-platform performance tuning, and compliance preparation against Sony TRC, Microsoft XR and Nintendo Lotcheck requirements.
Ownership and Support
Yes. All source code, project files, art assets and documentation are owned by you and transfer in full on final payment. Ownership is assigned in the contract from the start, and handover includes architecture documentation and walkthrough sessions so your team can continue development independently.
Yes. We provide post-launch support including patch releases, crash and telemetry triage, backend scaling, seasonal content updates and store maintenance. This runs either as a monthly retainer with a dedicated LiveOps team or as scheduled update windows agreed in advance.
Ready to Innovate?

United States:
2457 Kane Lane, Batavia, Illinois
60510

United Kingdom:
30 Charter Avenue, Coventry, CV4 8GE, United Kingdom

United Arab Emirates:
Unit No: 729, DMCC Business Centre Level No 1, Jewellery & Gemplex 3 Dubai, United Arab Emirates

India:
715, Astralis, Supernova, Sector 94 Noida, Delhi NCR India. 201301

Qatar:
B-ring road zone 25, Bin Dirham Plaza building 113, Street 220, 5th floor office 510 Doha, Qatar

© 2026 SDLC Corp. All Rights Reserved.